案例研究 2023年4月6日

案例研究: System upgrade saves £75,000 for government buildings

  • 1.8GWh of 能源 saving verified during the measurement and verification period
  • 减少350吨碳排放
  • £75,300 gas and electricity savings for the pilot project

挑战概述

A large government department needed 行业 expertise to upgrade its Building Management Systems (BMS) and optimise 47 sites across its estate. As a public sector organisation with multiple sites, sustainability was high on its agenda. It recognised that building control would be key to achieving its Greening 政府 Commitment targets.

The department wanted to improve the operational control of its sites while reducing 能源 use, improve the environmental performance of its estate and save carbon. It needed a partner that could work effectively on a diverse property portfolio, 英国各地, 谁有能力和专业知识进行调查, 设计, 安装, commission and verify savings associated with a BMS solution.

米蒂被选中调查这些地点, commission and 安装 BMS upgrades and implement the operational changes required with the site teams. This included delivering a measurement and verification service to help sustain improved building performance.

现代办公大楼,绿色的树叶
Building control is key to achieving Greening 政府 Commitment targets.

三步走

Our Plan Zero team agreed a three-step approach with the customer, which covered:

  • Site intervention and set up – delivering good site connectivity, upgrades of the BMS hardware and making sure that system back-up routines were optimised.
  • BMS centralisation and optimisation – investigating and altering the BMS set points, plus identifying wider building and HVAC 能源 conservation measures.
  • Measurement and verification – ongoing collection 数据分析 to make sure that optimisation measures were maintained, 能源和碳的节约得到证实.

Optimised BMS led to better control and 能源 performance

The site investigations highlighted opportunities to implement simple measures to reduce 能源 use. 加强基线数据整理, 通过项目, using accurate half-hourly data for both electricity and gas. This led to an improvement in the validation of 能源 baselines and performance optimisation.

1.验证节能8GWh, 碳排放量减少了350吨, 并节省75英镑,300美元用于项目期间的燃气和电力.

Mitie’s team also made recommendations to widely deploy 能源 efficiency measures and renewable 科技nologies across the sites.

改进的BMS技术解决方案, 数据分析, has enabled the customer to achieve and maintain a better level of control and 能源 performance.

一个人看着显示数据的屏幕
Mitie’s ongoing data collection and analysis made sure that optimisation measures were maintained, 能源和碳的节约得到证实.

为什么选择Mitie ??

作为现任FM合作伙伴, Mitie already had an excellent level of site knowledge and system know-how. 然而, our extensive BMS capability and experience across numerous customer accounts, 在公共和提供部门, 是什么造成了差异.

通过选择和与Mitie合作, our customer was able to work with a solution provider, 和合作伙伴, 谁会花时间去了解他们的需求. We developed a solution that serviced the customer’s need to reduce current 能源 use and enabled the testing of a robust estate-wide solution for the future.